Skip to content
中文
Tianda Institute

Tianda Institute

  • Home
  • Opinion & Analysis
  • Tianda Reports
  • Publications
  • Events
  • About Us
    • About Tianda Institute
    • Our Vision
    • Disclaimer
    • Contact Us
  • Home
  • 2011
  • August
  • 4
  • Contemporary High-Speed Rail Operations with an Out-Dated Management Philosophy
  • Opinion & Analysis

Contemporary High-Speed Rail Operations with an Out-Dated Management Philosophy

Yi Heng
2011-08-04

While trains in China are travelling at a higher speed, management of high-speed rail operations need to also be improved. Despite the aftermath of the Wenzhou high-speed train collision and derailment accident, a number of government officials still embrace an out-dated working attitude and methods to cope with the rapid development of high-speed railway as well as a dynamic civil society.

For details please go to the Chinese version>>

Continue Reading

Previous: China Railway Reform Calls for Immediate Attention
Next: James Soong to Run for Presidency

相关文章

Tianda Institute's Seminars on the Improved Electoral System Tianda Institute’s Seminars on the Improved Electoral System
  • Opinion & Analysis

Tianda Institute’s Seminars on the Improved Electoral System

放棄意識形態之爭-共享RCEP成果 RCEP signed for shared prosperity despite ideological divides
  • Opinion & Analysis

RCEP signed for shared prosperity despite ideological divides

台湾选举尘埃落定后的政治生态 Political ecology in Taiwan after its Elections
  • Opinion & Analysis

Political ecology in Taiwan after its Elections

美伊战争是将来时 US-Iran war will not happen soon
  • Opinion & Analysis

US-Iran war will not happen soon

002 Conference on “One Country, Two Systems” and the Basic Law held in Hong Kong
  • Opinion & Analysis

Conference on “One Country, Two Systems” and the Basic Law held in Hong Kong

发展科创板-培育科技企业 Making STAR market cradle of tech enterprises
  • Opinion & Analysis

Making STAR market cradle of tech enterprises

Copyright © 2021 Tianda Institute. All Rights Reserved.